4Auditee guide · Manufacturing & engineering

ISO 22163Railway quality management, explained for the people doing the work.

See what the standard covers, gather supporting records and prepare for your next assessment.

By 4AuditeeRailway management-system certificationReferences checked 26 September 2026

What does ISO 22163 cover?

ISO 22163 combines ISO 9001 with railway quality management requirements. IRIS certification adds scheme-specific assessment arrangements. Understanding both the standard and the scheme prevents an incomplete preparation plan.

Who it is for

Rail-sector organizations managing products, projects and services within their agreed scope.

Key areas to understand

Start with these areas. Identify which requirements apply to your activities and who is responsible for them.

  1. 1Control project and customer requirements through delivery.
  2. 2Manage configuration, changes and supply-chain performance.
  3. 3Evaluate process performance and improvement.

Evidence to prepare

This list is a starting point. Check the standard for all required documents. For each item, record who is responsible, the activity or site it relates to, and a recent example showing how it works.

  • Project requirements and review decisions
  • Configuration and change-control records
  • Supplier performance and acceptance evidence
  • Project risk and action records
  • Process measures and improvement reviews

Keep records that explain what was checked, which requirement was used and who checked it. Include any action taken when a requirement was not met. Link each record to the work it supports.

An internal audit example

Suggested checks from 4Auditee

Choose a railway project with a late engineering change. Follow the requirement through design decisions, purchasing, production and acceptance. Check whether affected suppliers and project teams worked to the same approved configuration.

Choose a sample that suits your activities and risks. If you find a gap, record the requirement, the evidence and what was missing. Check more examples if the first results suggest a wider problem.

A common problem to check

A project dashboard can look healthy while requirement changes remain unresolved. Sample the underlying technical decisions, not just milestone completion.

Prepare for assessment

The assessment type for this guide is railway management-system certification. Confirm the requirements, what will be assessed and how the assessment will work with the responsible body or customer. These steps help you prepare. You must also follow the scheme’s official rules.

  1. Define what is covered. List the products, services, activities and sites. Record the standard edition, additional scheme rules and customer requirements.
  2. Find what is missing. Compare the requirements with current work. Prioritise gaps by risk. Assign someone responsible and a completion date.
  3. Keep records of everyday work. Check a sample of actual records and speak with the people involved. Make sure they understand their responsibilities.
  4. Check the results. Complete internal reviews and audits. Check that corrective actions worked before closing problems.

From one site to many

Make it easy to find who is responsible at each site. Keep company policies separate from records of local work. Link each site’s records to its activities, risks and requirements so you can spot gaps at individual sites.

Sites that share a management system do not automatically qualify for one certificate or assessment. Confirm which sites can be included and how they will be checked with the assessment body.

About this guide and its sources

4Auditee wrote this guide using the public source below. The evidence list, audit example and preparation steps are our suggestions. Read the official standard and scheme rules for the full requirements. This guide does not include the standard’s full text or provide certification.

DNV: ISO 22163 reference information

Related guides